|
EPC for Balasore thermal plant
tender flash
Balasore Alloys Ltd has invited global bids for the
engineering, procurement and construction package for the 1x 67.5 mw coal-based
thermal power plant (phase-I) at its plant at Balgopalpur in Balasore district,
Orissa, on a single-point responsibility turnkey basis.
The scope of work includes EPC for boiler turbine generator and balance of plant
package (BTG + BoP) with provision for installation of another 1x 67.5 mw unit
(phase-II) in future, to be set up adjacent to the existing ferroalloys plant.
The cost of tender documents is Rs 20,000 and the last date of submission of
bids is April 21, 2008.
Contact: Head - Power Plant, Balasore Alloys Ltd, Balgopalpur, Balasore,
Orissa 756020. Tel: 06782-275781-85; Fax: 06782-275724; URL:
www.balasorealloys.com/pdf/Tender% 20Notice. pdf
[March 17-23, 2008]
|