The scope of work includes construction of railway siding including earthwork in railway formation, RCC box culverts, major bridges, track linking, including supply of track ballast, point & crossing, P-Way fittings & fixture and supply, installation, commissioning of in motion weigh bridge, etc excluding supply of rails and PSC sleepers (Package-IV) of rail infrastructure of Buxar Thermal Power project (two x 660 MW) at Chausa in Buxar district of Bihar.
The estimated value of the project is Rs 211.75 crore with completion period of 18 months.