
The scope of work includes construction of cable stayed road-over-bridge (RoB) at existing RoB location between EP/19/156 and EP/20/1 between Ghatkopar and Vikhroli station in Mumbai division of Central Railway.
The estimated value of the project is Rs 145 crore.


