NTPC has declared commercial operation date (COD) of Unit-2 of 660 MW capacity of Tanda Super Thermal Power Station, Stage-II (two x 660 MW).
The COD has been declared from 1 July 2021.
With this, the commercial capacity of NTPC and NTPC Group will become 52,400 MW and 65,165 MW respectively.


