The National Highways Authority of India (NHAI) has invited bids for four-laning of Balwara to Dhangaon section. The scope of work includes four-laning of Balwara to Dhangaon section of NH-347BG & 753L (Indore to Boregaon) (Package-III) design ch 42.260 to design ch 82.810 (length - 40.40 km) Phase-I in the state of Madhya Pradesh through engineering, procurement and construction (EPC) contract under Bharatmala Pariyojana. The estimated value of the project is Rs 770.48 crore with completion period of 24 months.

ARSS Infrastructure Projects secures contract worth Rs 210 crDilip Buildcon has received a letter of acceptance (LoA) for a road project from the National Highways Authority of India (NHAI) on 14 December 2020.

The scope of work includes four-laning of Dhrol-Bhadra Patiya section of NH-151A (excluding 5.700 km to 13.600 km of SH-25) and Bhadra Patiya-Pipaliya section of NH-151A (excluding 73.000 km to 44.800 km and 38.350 km to 24.000 km of CSH-6) in the state of Gujarat through PPP on design, build, operate and transfer (DBOT) annuity or hybrid annuity mode (HAM) basis.

The bid project cost is Rs 882 crore with completion period of 24 months. The operation period is 15 years from COD.


Print pagePDF pageEmail page