Metro Railway, Kolkata floats tenders

Metro Railway, Kolkata floats tendersThe Metro Railway, Kolkata has floated tenders for civil engineering works. The scope of work envisages execution of civil engineering works for construction of underground rcc box tunnel including station building (birati) using diaphragm wall h-pile plunge pile etc at a cost of Rs 583.03 crore in a period of 36 months.

The work also involves execution of civil engineering works for construction of underground rcc box tunnel including station building (birati) using diaphragm wall h-pile plunge pile etc and allied works from Ch 8.795 to 9.840 km by cut & cover method (top down) for two tracks/ multiple tracks in connection with extension of Metro Railway from Noapara to Barasat via Bimanbandar in West Bengal at a cost of Rs 286.33 crore.

Execution of civil engineering works for construction of underground rcc box tunnel including station building (new barrackpore) using diaphragm wall h-pile plunge pile etc and allied works from Ch 9.840 to 10.580  km by cut & cover Method (top down) for two tracks/ multiple tracks in connection with extension of Metro Railway from Noapara to Barasat via Bimanbandar in West Bengal entailing an investment of Rs 222.58 crore.

Execution of civil engineering works for construction of underground rcc box subway, dispersals (entry/ exit facility) and allied works to provide subay connectivity from undeground Bimanbandar Station to Berminal Building of NSCBI, Airport (Airport Portion), including finishing, fire suppression & other allied works in connection with extension of Metro Railway from Noapara to Barasat via Bimanbandar in West Bengal at a cost of Rs 48.31 crore.

The works will be completed in a period of 36 months.


Print pagePDF pageEmail page